The generated green energy is up to 10% of the metro-station’s monthly energy demand in Spring and Summer months. On the strongest days, the PV system can supply up to 50% of the station’s energy need.
Outlook
Regarding the feasibility, the Wiener Linien pilot project covers all obstacles (e.g. weight, electrical earthing) other potential locations of mobility providers equally struggle with. Due to the excellent experience at this metro station, Wiener Linien is currently checking other metro stations for the possibility of installing a PV system. The goal is to install a PV system on as many stations as possible, to use as much green energy as possible for powering the auxiliaries of the stations. But with a view to the financial aspect, Wiener Linien will use conventional PV-Systems where it is possible, as its costs are lower.
Source: Interreg EfficienCE
Author of the article: Wiener Linien
Cover photo: Wiener Linien